home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_7 / V13_736.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/ocOk0g600WBwA7x04J>;
  5.           Fri, 28 Jun 91 05:23:56 -0400 (EDT)
  6. Message-ID: <IcOk0am00WBwM7vE43@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Fri, 28 Jun 91 05:23:51 -0400 (EDT)
  12. Subject: SPACE Digest V13 #736
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 736
  15.  
  16. Today's Topics:
  17.               Re: SPACE Digest V13 #620
  18.                Re: What's HUD?
  19.                Re: What's HUD?
  20.                    Re: Gold
  21.       Re: Excavating (minig) gold in the space by NASA.
  22.          GALILEO MISSION STATUS June 6, 1991
  23.   MAJOR GEOMAGNETIC STORM UPDATE - LOW LAT. AURORAL UPDATE - 14 JUNE
  24.                Re: Freedom Cost
  25.                Re: What's HUD?
  26.  
  27. Administrivia:
  28.  
  29.     Submissions to the SPACE Digest/sci.space should be mailed to
  30.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  31.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  32.              tm2b+@andrew.cmu.edu
  33.  
  34. ----------------------------------------------------------------------
  35.  
  36. Date: 13 Jun 91 00:15:13 GMT
  37. From: comp.vuw.ac.nz!waikato.ac.nz!pjs1@uunet.uu.net
  38. Subject: Re: SPACE Digest V13 #620
  39.  
  40. In article <9106122205.AA22356@ucbvax.Berkeley.EDU>, space-request+@ANDREW.CMU.EDU writes:
  41. > Re: processing in space
  42. >>In the ice fragment
  43. >>business scenario, most of the money needs to be spent not on the
  44. >>capture itself, but on processing the comet material into various products
  45. >>after it has already been delivered into earth orbit,
  46. >  ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
  47. > Is this the best way?  It's unsafe, for starters (Just becuase were off the
  48. > Earth, did you think environmental problems don't exist? :-)
  49. > And, presumably, you process this stuff because there are parts you don't
  50. > want.  Why move the stuff you don't want, when there's no reason not to
  51. > do the processing where you find it?
  52. > Tom McWilliams
  53. > Acknowledge-To: <18084TM@MSU>
  54.  
  55.     It's basically a question of economics (so are most things at some
  56. level). Wether the costs (transport mining gear out, mine, transport good stuff
  57. in) of transporting the mining equipement to the asteroid outways the costs
  58. (transport asteroid in, mine, transport rubbish out).
  59.     Transporting the mining geasr has costs in terms of time/ amount of
  60. mining. The time to travel between asteroids will be a loss of money (options
  61. include disposable mining gear or lots of mining gear). However the extra cost
  62. of transporting the unwanted parts of the asteroid may exceed this (hence
  63. choice would depend on the purity of the asteroid. The cost of mining at a
  64. distance would also have to be concidered, teleoperation etc will be more
  65. difficult at greater distances.
  66.     The one other thought that occurs to me is that mining in earth orbit
  67. will eventually pollute the space around our planet, thereby increasing the
  68. problems in transit to and from it.
  69.  
  70.     This all of course pertains to a time when we have an established
  71. mining infer structure. Before we can do this we need to learn the processes
  72. involved and practice them. To practice them we need something to practice on.
  73. This means we have two choices either practice on captured asteroids (ie.
  74. develop the technology to capture these things to help us decide if this
  75. technology is worthwhile) or on the moon. An experimental mine station on the
  76. moon would be more useful if it was man-tended and as such a moonbase is an
  77. obvious goal. I won't comment on the best method to establish this base here as
  78. that is a seperate (and currently firey issue:-).
  79.  
  80. Pete Smith
  81. Uni of Waikato (Y-cat-O)
  82.  
  83. ------------------------------
  84.  
  85. Date: 13 Jun 91 00:26:33 GMT
  86. From: hub.ucsb.edu!ucsbuxa!3001crad@ucsd.edu  (Charles Frank Radley)
  87. Subject: Re: What's HUD?
  88.  
  89.  
  90.  
  91. HUD is also the agency who accounting errors could fund the entire
  92. Space Station program
  93. :
  94.  
  95. ------------------------------
  96.  
  97. Date: 13 Jun 91 00:29:50 GMT
  98. From: hub.ucsb.edu!ucsbuxa!3001crad@ucsd.edu  (Charles Frank Radley)
  99. Subject: Re: What's HUD?
  100.  
  101.  
  102.  
  103. Before we privatise NASA, let's privatize VA.
  104. The British National Health Service has started to massively
  105. contract out its hospitals, it is saving a bundle.
  106.   We already have the technology and capability to  build
  107. privately funded hospitals, to be privately operated.
  108. A much more viable proposition than privatizing NASA.
  109.  
  110. ------------------------------
  111.  
  112. Date: 13 Jun 91 07:54:35 GMT
  113. From: fernwood!csl!hercules.csl.sri.com!billw@uunet.uu.net  (William )
  114. Subject: Re: Gold
  115.  
  116.  
  117. >(closest point).  It apparently contains 10000 tons of gold and 
  118. >100000 tons of platinum, as well as 10 billion tons of iron and 1 
  119. >billion tons of nickel.  Its estimated worth was put at around 1 
  120. >trillion dollars.
  121.  
  122. Not to be negative, but this is about 0.0001% gold and .001% platinum.
  123. Unless this is lying around in convient chunks (not very likely), the
  124. fact that there is 20E6 miles of vacuum is only a small worry.  (similar
  125. to the oft repeated fact that each cubic mile of seawater contains $$$$
  126. in precious metals.)  Eventually (hopefully?) such rocks will be mined
  127. primarilly for their nickel/iron content...
  128.  
  129. BillW
  130.  
  131. ------------------------------
  132.  
  133. Date: 13 Jun 91 14:18:12 GMT
  134. From: iggy.GW.Vitalink.COM!widener!dsinc!ub!uhura.cc.rochester.edu!rochester!dietz@lll-winken.llnl.gov  (Paul Dietz)
  135. Subject: Re: Excavating (minig) gold in the space by NASA.
  136.  
  137. meltsner@crd.ge.com (Kenneth J Meltsner) writes:
  138.  
  139.   >If you'd like some 1 ppm gold ore, I can probably get you some dirt
  140.   >cheap right here on Earth.  In fact, while I don't have any specific
  141.   >numbers handy, there's probably at least 1 ppm gold in sea salt.
  142.  
  143. The concentration of gold in sea salt is < .5 ppb.
  144.  
  145. dlbres10@pc.usl.edu (Fraering Philip) writes:
  146.  
  147.   Well, that's not quite it; when gold is mined from rock on earth,
  148.   the gold is extracted from the rock, usually at a couple ounces per
  149.   ton, and then the remaining ton of rock is thrown out.
  150.  
  151.   The process used to extract gold from nickel-iron would be the carbonyl
  152.   process, and it may or may not be more efficient than some of the methods
  153.   used here.
  154.  
  155. I expect that the terrestrial processes are actually cheaper.  The
  156. process used on dilute gold ore, cyanide leaching, dissolves
  157. submicroscopic gold specks out of a porous insoluble matrix.
  158.  
  159. In contrast, the carbonyl process removes the waste material, leaving
  160. the valuable material behind.  The mass flow through the process is
  161. much larger.
  162.  
  163.   Also, the residue from he process would be iron, not more useless
  164.   rock. Any space mining done will have the bulk of the material used in
  165.   space. Mining the rock referred to in the article would have the side effect
  166.   of producing lots of gold.
  167.  
  168. This market does not exist, and won't exist for decades, if not
  169. generations.  At 1ppm, you need to make a million tons of iron
  170. to get 1 ton of gold.  This is orders of magnitude beyond
  171. the mass launched into space so far.
  172.  
  173. An aside: it doesn't make sense to move an entire asteroid to earth
  174. orbit.  In almost all terrestrial mining, it makes economic sense
  175. to "beneficiate" ores at the mine before shipping.  This can be
  176. as simple as crude processes based on density differences.
  177.  
  178.     Paul F. Dietz
  179.     dietz@cs.rochester.edu
  180.  
  181. ------------------------------
  182.  
  183. Date: 13 Jun 91 14:59:09 GMT
  184. From: infonode!hychejw@uunet.uu.net  (Jeff W. Hyche)
  185. Subject: GALILEO MISSION STATUS June 6, 1991
  186.  
  187. GALILEO MISSION STATUS June 6, 1991
  188.  
  189.      The Galileo spacecraft is 68 million miles from Earth, making
  190. the round-trip communication time 12 minutes, 9 seconds.  Speed in
  191. orbit is down to 50,300 miles per hour, and the solar distance is
  192. now 155 million miles.
  193.  
  194.      This week the sun moved to such an angle that Galileo's sun-
  195. gate sensor once again could see the shadow of one of the antenna
  196. ribs sweeping by as the spacecraft rotates.  This is how spacecraft
  197. analysts originally estimated the position of the partially
  198. deployed high-gain antenna; with indications from radio-signal and
  199. other tests, this provides additional confirmation that the warming
  200. maneuver conducted two weeks ago did not change the antenna's
  201. position.  A greater degree of warming will be available in about
  202. 15 months; in the meantime, Galileo will cool gradually as it
  203. recedes from the Sun.
  204.  
  205.      Otherwise, Galileo's health and performance are excellent. The
  206. spacecraft is spinning at a little less than 3 revolutions per
  207. minute and transmitting engineering telemetry data at 40 bits per
  208. second.
  209.  
  210.                               #####
  211. -- 
  212.                                   // Jeff Hyche           
  213.     There can be only one!    \\ //  Usenet: hychejw@infonode.ingr.com
  214.                                \X/   Freenet: ap255@po.CWRU.Edu
  215.  
  216. ------------------------------
  217.  
  218. Date: Thu, 13 Jun 91 16:09:51 MDT
  219. From: oler <@BITNET.CC.CMU.EDU:oler@HG.ULeth.CA> (CARY OLER)
  220. Subject: MAJOR GEOMAGNETIC STORM UPDATE - LOW LAT. AURORAL UPDATE - 14 JUNE
  221. X-St-Vmsmail-To: st%"space+@andrew.cmu.edu"
  222.  
  223.                        /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
  224.  
  225.                             GEOMAGNETIC STORM UPDATE
  226.  
  227.                        /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
  228.  
  229.                                22:00 UT, 13 June
  230.  
  231.                                  -------------
  232.  
  233.  
  234. STORM UPDATE INFORMATION:
  235.  
  236.      Major to severe geomagnetic storming has been observed over the past 12
  237. to 18 hours (since approximately 07:00 UT on 13 June).  Storming intensified
  238. after a second sudden magnetic impulse was observed at 06:52 UT on 13 June.
  239. Activity since then has ranged from minor to severe storm levels.
  240. Magnetopause crossings of several geosynchronous satellites was observed
  241. between approximately 18:30 UT and 19:30 UT on 13 June, corresponding to a
  242. major to severe geomagnetic activity period.  A Forbush decrease of between
  243. 10 to 15 percent has been observed with this disturbance.
  244.  
  245.      The A-indices for 13 June are at high-intensity major storm to
  246. low-intensity severe storm levels (near 100).
  247.  
  248.      Geomagnetic activity is expected to begin subsiding later in the UT day
  249. of 14 June, with a more complete return to generally active levels by 15
  250. June.
  251.  
  252.      Auroral activity over North America on the evening of 12/13 June was
  253. disappointingly low.  High levels of activity were observed over the
  254. northerly middle and high latitude regions, but equatorward expansion and
  255. luminosity of the auroral activity was insufficient to provide widespread
  256. observations over the lower latitudes.  However, this may change on the
  257. evening of 13/14 June.
  258.  
  259.      The Low Latitude Auroral Activity Warning remains in effect for the
  260. local evening hours of 13/14 June (for North America, between approximately
  261. 04:00 UT and 12:00 UT on 14 June).  If the present disturbance persists long
  262. enough, auroral activity over the lower latitudes may be possible.  This is
  263. expected to be the last evening for a good chance to view auroral activity
  264. over the lower latitudes.  The Low Latitude Auroral Activity Warning is
  265. expected to be downgraded to a Watch (or possibly even cancelled) for 15
  266. June.
  267.  
  268.      Ionospheric storming has strongly degraded HF radio propagation
  269. conditions over the middle to low latitudes.  High and polar latitudes are
  270. experiencing blackout conditions due to the ionospheric storming, and PCA
  271. activity.  Conditions will gradually improve for the low and middle latitudes
  272. later in the UT day of 14 June and throughout the entire day of 15 June,
  273. while high latitudes will continue to experience fairly strong degraded
  274. conditions.  A return to more normal ionospheric conditions is not
  275. anticipated for the remainder of this week.
  276.  
  277.  
  278.                        /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
  279.  
  280. ------------------------------
  281.  
  282. Date: 11 Jun 91 13:54:24 GMT
  283. From: ssc-vax!bcsaic!hsvaic!eder@beaver.cs.washington.edu  (Dani Eder)
  284. Subject: Re: Freedom Cost
  285.  
  286. In article <30959@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  287. >
  288. >Remember, Freedom was a <$10G program, too, when it started.  If EOS
  289. >turns out to be more than that, does that mean you are a liar?  After all, 
  290. >you accused the NASA leadership of lying about Freedom costs back when 
  291. >they were calling it an $8G program.
  292. >
  293. >Alternately, can we consider the possibility that they made an honest
  294. >mistake when they thought it was $8G?  Allen Sherzer just stated that 
  295. >EOS is a $30G program, so if he's right you'll need to make up your mind
  296. >pretty quick.
  297. >-- 
  298.  
  299. Having been on the Space Station Program from a month after Boeing
  300. was awarded the Work Package 1 contract, and having been the person
  301. responsible for the life cycle cost numbers at the time (I am no longer
  302. with the Space Station program), Per haps I can shed some light on
  303. this discussion.
  304.  
  305. The wide range of numbers quoted for the Space Station may all be
  306. correct, because they refer to different costs.  Here are the
  307. different types of cost:
  308.  
  309. Life Cycle Cost: The total cost of a program, including everything.
  310. It is defined as Development Cost+Production Cost+Operations Cost.
  311.  
  312. Development Cost: All costs which are non-recurring, through the
  313. first flight-ready unit.
  314.  
  315. Production Cost: Costs which recur on the 2nd through nth units.
  316. Depending on the part of the space station, this varies in extent,
  317. for example there will be about 200 equipment rack frames built,
  318. so this item has lots of production cost, but the life sciences
  319. glove box is a unique item, so it is all developmental, with no
  320. production.
  321.  
  322. Operations Cost: Everything that happens after Development and
  323. Production, i.e. launch, assembly in orbit, and use.  Most of
  324. the life cycle is incurred here.
  325.  
  326. The above costs include everything associated with the program.
  327. Now we come to costs which are defined by NASA accounting methodology
  328. (i.e. which have no necessary connection with physical reality)
  329.  
  330. Program Funding: Those costs which appear as line items in the
  331. NASA budget under the heading "Space Station".  This item excludes
  332. NASA personnel salaries and costs of running the basic centers
  333. (office realted costs).  Those costs appear under "Research and Program
  334. Management".  This item also excludes the cost of launches, which
  335. is under the "Space Shuttle" budget line.
  336.  
  337. Contracted Cost: This is the smallest number, it is the dollar value
  338. of contracts let to prime contractors and support contractors
  339. specifically for Space Station harware and services.  Contracted cost
  340. is a subset of Program Funding, the difference being an internal
  341. 'tax' the NASA centers assess each program to cover the cost of
  342. general purpose research and development equipment.  Examples of
  343. such are: neutral buoyancy tanks, vacuum chambers, and test stands.
  344. These items are used by multiple projects, so they are each assessed
  345. a share in the cost of operating them.
  346.  
  347. Now for some examples:
  348.  
  349. Initial development cost quoted to Congress in 1984: $8 billion
  350. Budgeted development cost in 1988, in 1984$:    $10 billion
  351. Budgeted development cost in 1988, in
  352.     then-year dollars (dollars spent
  353.     in future years adjusted for expected
  354.     inflation)                $16.5 billion
  355. Program Funding over life of program
  356.     (includes 30 years of operations)
  357.     Development    $16.5B
  358.     Production    1-2B
  359.     Operations    $50B
  360.     Total                    $68 billion
  361. Life Cycle Cost
  362.     Program Funding    $68B
  363.     Launch costs (160 shuttle launches
  364.         @ $340M each=$54.4B
  365.     NASA personnel costs @ 20% of above
  366.         = $25B
  367.     Total                    $147.4 billion
  368.  
  369. Percentage of total NASA budget attributable to Space
  370. Station: $147.4/40years=3.685billion/year = about 25% of total
  371. NASA budget (at present levels).
  372.  
  373. Dani Eder
  374. Advanced Civil Space Systems
  375.  
  376. ------------------------------
  377.  
  378. Date: 12 Jun 91 21:08:36 GMT
  379. From: cis.ohio-state.edu!zaphod.mps.ohio-state.edu!mips!ptimtc!nntp-server.caltech.edu!news@ucbvax.Berkeley.EDU  (Steinn Sigurdsson)
  380. Subject: Re: What's HUD?
  381.  
  382. In article <1991Jun12.161157.29386@iti.org>, aws@iti (Allen W. Sherzer) writes:
  383. >In article <1991Jun8.071748.28566@sequent.com> szabo@sequent.com writes:
  384. >
  385. >>>Not being a US citizen, I have no idea what HUD stands for. Could someone
  386. >>>please enlighten me?
  387. >
  388. >>Department of "Housing and Urban Development".  These guys can build
  389. >>2,000,000 houses on Earth for every one house NASA can build in space.
  390. >
  391.  
  392.     Funny, I thought they concentrated on developing golf courses
  393. in Palm Springs...
  394.  
  395.  
  396.  
  397.  
  398. (recent local scandal - some wealthy town used HUD grants to develop a
  399. golf course or functional equivalent thereof - not my idea of how to
  400. spend tax dollars)
  401.  
  402. ------------------------------
  403.  
  404. End of SPACE Digest V13 #736
  405. *******************
  406.